Changes between Version 240 and Version 241 of docs/CommissioningPlan
- Timestamp:
- 03/09/22 16:28:27 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v240 v241 7 7 || 0.2 || 24-Apr-2021 || All || updates in Phase 3 and 4, change in duration || KRA || 8 8 || 0.3 || 14-Jan-2022 || All || Minor corrections and additions || KRA || 9 || 0.4 || 28-Feb-2022 || First page, Phase 1 (especially P1.3, P1.4, and P1.6) || LBTO Support is removed from the table. It can be seen inside individual activities. Minor modifications to accordance with RFA-78 andRFA-88. || KRA ||9 || 0.4 || 28-Feb-2022 || First page, Phase 1 (especially P1.3, P1.4, and P1.6) || LBTO Support is removed from the table. It can be seen inside individual activities. Minor modifications in accordance with RFA-78, RFA-79, RFA-88. || KRA || 10 10 11 11 == Applicable Documents == … … 13 13 || '''No.''' || '''Title''' || '''Number & Issue''' || 14 14 || AD1 || SHARK-NIR Schedule || SHARK-NIR-INAFP-SCH-001 Issue 1.3 || 15 || AD2 || SHARK-NIR SHINS Interface Control Document || SHARK-NIR-INAFP-ICD-002 Issue 0. 4||16 || AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-MAN-001 Issue 2. 0||15 || AD2 || SHARK-NIR SHINS Interface Control Document || SHARK-NIR-INAFP-ICD-002 Issue 0.6 || 16 || AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-MAN-001 Issue 2.1 || 17 17 || AD4 || SHARK-NIR Calibration Procedures || SHARK-NIR-INAFP-MAN-004 Issue 0.2 || 18 || AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 Issue 1. 0||18 || AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 Issue 1.2 || 19 19 || AD6 || SHARK-NIR Cryostat Procedures ||SHARK-NIR-SO-MAN-001 Issue 0.4 draft || 20 20 || AD7 || SHARK-NIR Science Cases ||SHARK-NIR-INAFP-SCI-001 Issue 0.1 || 21 21 || AD8 || SHARK-NIR Integration & Commissioning Schedule ||SHARK-NIR-INAFP-SCH-002 Issue 1.0|| 22 22 || AD9 || Observing Blocks Template Manual ||SHARK-NIR-INAFP-MAN-002 Issue 0.1 (not released yet)|| 23 || AD10 || Packing, Handling, Shipping and Transportation (PHS&T) Plan ||SHARK-NIR-INAFP-PLN-002 Issue0. 1||24 || AD11 || Handling equipment design description ||SHARK-NIR-INAFP-DES-006 Issue0. 1||23 || AD10 || Packing, Handling, Shipping and Transportation (PHS&T) Plan ||SHARK-NIR-INAFP-PLN-002 Issue0.2|| 24 || AD11 || Handling equipment design description ||SHARK-NIR-INAFP-DES-006 Issue0.2|| 25 25 26 26 == Introduction ==