Changes between Version 229 and Version 230 of docs/CommissioningPlan


Ignore:
Timestamp:
01/21/22 17:20:00 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v229 v230  
    131131||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C3 + C4||Liquid N2 refill is required in the cleanroom.||
    132132||P1.12||[wiki:/docs/CommissioningPlan/P1.12 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C3||Liquid N2 refill is required in the cleanroom. LBTO SW support may be required.||
    133 ||Total||(2.5 days of) contingency (15%) included within|| ||17|| || ||
     133||Total||(2 days of) contingency (15%) included within|| ||17|| || ||
    134134
    135135=== Phase 2 (Pre-commissioning)===