v216 v217 129 129 ||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Internal tip-tilt loop verification]||Day||1||C1||Liquid N2 refill is required in the cleanroom.|| 130 130 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 NCPA routine verification]||Day||0.5||C1||Liquid N2 refill is required in the cleanroom.|| 131 ||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C 1+ C4||Liquid N2 refill is required in the cleanroom.||132 ||P1.12||[wiki:/docs/CommissioningPlan/P1.12 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C 1||Liquid N2 refill is required in the cleanroom. LBTO SW support may be required.||131 ||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C3 + C4||Liquid N2 refill is required in the cleanroom.|| 132 ||P1.12||[wiki:/docs/CommissioningPlan/P1.12 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C3||Liquid N2 refill is required in the cleanroom. LBTO SW support may be required.|| 133 133 ||Total||(2 days of) contingency (10%) included within|| ||16|| || || 134 134