Changes between Version 213 and Version 214 of docs/CommissioningPlan
- Timestamp:
- 01/14/22 12:17:29 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v213 v214 52 52 || OC16 || LSS (R~100) distant companion || 53 53 || OC17 || LSS (R~800) close companion || 54 Note that technically and software-wise, there are no differences between (OC1 6 & OC17) and (OC14 & OC15), and therefore not tested separatelyfor Phase 3 nighttime commissioning.54 Note that technically and software-wise, there are no differences between (OC14 & OC16) and (OC15 & OC17), and therefore only OC14 and OC15 will be tested for Phase 3 nighttime commissioning. 55 55 56 56 In the table above, the acronyms mean the following: … … 73 73 ||Nighttime calibration||C6|| 74 74 ||Nighttime testing for performance||C7|| 75 || Science verification / Early science||C8||75 ||Early science or Science verification||C8|| 76 76 77 77 == Naming structure of the commissioning activity == … … 95 95 - Explains in detail how to execute the test 96 96 97 Templates 98 - Mentions the templates to be used. If there are specific parameters to be, they are mentioned in brackets. 99 97 100 Success Criteria 98 101 - Enumerates the outcome associated with successful completion of the test … … 114 117 115 118 == Commissioning Activity == 116 In this section, all the commissioning activities are listed in chronological order. If you click the individual activity, more details can be found. __8 hours is considered as the duration of a day/night__. It is to be noted that the phases do not correspond to the commissioning runs. The various commissioning runs with the list of activities to be performed (derived from this document) will be decided at a later point in time. Of course, depending on the month of the year, we will modify the actual number of days required for that specific commissioning run. From commissioning experience at the LBT, for the daytime activities at the telescope platform, the telescope can be handed over around 09:00 am local time. And we need to hand it over back to theLBT ~2 hours before the sunset (unless we have the first half of the night or full night and to be negotiated with the telescope operator). Note that the duration of the individual activities mentioned in this document will not match that of AD4 for the same activities.119 In this section, all the commissioning activities are listed in chronological order. If you click on the individual activity, you can find more details. __8 hours is considered as the duration of a day or night__. It is to be noted that the phases **do not** correspond to the commissioning runs. The various commissioning runs with the list of activities to be performed (derived from this document) will be decided at a later point in time. Of course, depending on the month of the year, we will modify the actual number of days required for that specific commissioning run. From commissioning experience at the LBT, for the daytime activities at the telescope platform, the telescope may be handed over around 09:00 am local time. And, the SHARK-NIR team needs to hand over the telescope to LBT ~2 hours before the sunset (unless we have the first half of the night or full night and to be negotiated with the telescope operator). Note that the duration of the individual activities mentioned in this document will not match that of AD4 for the same activities. 117 120 118 121 === Phase 1 (Pre-commissioning)=== 119 '''SHARK-NIR Location''': LBT mountain bay and clean room. Some of the activities may run in parallel. All daytime activities. In the cleanroom, usually, there are no restrictions on daytime or nighttime activity.122 '''SHARK-NIR Location''': LBT mountain bay and clean room. Some of the activities may run in parallel. All the activities are daytime. In the cleanroom, usually, there are no restrictions on daytime or nighttime activity. 120 123 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (days)'''||'''Category'''||'''LBTO Support'''|| 121 124 ||P1.1||[wiki:/docs/CommissioningPlan/P1.1 Inspection of the closed boxes]||Day||0.5||C1||Crane operator (mountain bay) to lift and move stuff. 1-2 crew to support moving containers/boxes.||