Changes between Version 205 and Version 206 of docs/CommissioningPlan
- Timestamp:
- 01/11/22 10:56:49 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v205 v206 122 122 ||P1.5||[wiki:/docs/CommissioningPlan/P1.5 SW checks and motors initializations]||Day||1||C1||-|| 123 123 ||P1.6||[wiki:/docs/CommissioningPlan/P1.6 Cryostat cool down]||Day||1||C1||Liquid N2 refill is required in the cleanroom. Vacuum pump and support for cooling down the cryostat.|| 124 ||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Motor/light sources functional verification and filter artifacts/defects verification]||Day|| 0.5||C1||Liquid N2 refill is required in the cleanroom.||124 ||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Motor/light sources functional verification and filter artifacts/defects verification]||Day||1.5||C1||Liquid N2 refill is required in the cleanroom.|| 125 125 ||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Internal alignment verification]||Day||4||C1||Liquid N2 refill is required in the cleanroom.|| 126 126 ||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Internal tip-tilt loop verification]||Day||1||C1||Liquid N2 refill is required in the cleanroom.|| 127 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 NCPA routine verification]||Day|| 1.5||C1||Liquid N2 refill is required in the cleanroom.||127 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 NCPA routine verification]||Day||0.5||C1||Liquid N2 refill is required in the cleanroom.|| 128 128 ||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C1 + C4||Liquid N2 refill is required in the cleanroom.|| 129 129 ||P1.12||[wiki:/docs/CommissioningPlan/P1.12 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C1||Liquid N2 refill is required in the cleanroom. LBTO SW support may be required.||