    122122||P1.5||[wiki:/docs/CommissioningPlan/P1.5 SW checks and motors initializations]||Day||1||C1||-||
    123123||P1.6||[wiki:/docs/CommissioningPlan/P1.6 Cryostat cool down]||Day||1||C1||Liquid N2 refill is required in the cleanroom. Vacuum pump and support for cooling down the cryostat.||
    124 ||P1.7||[wiki:/docs/CommissioningPlan/P1.7 NCPA routine verification]||Day||0.5||C1||Liquid N2 refill is required in the cleanroom.||
     124||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Motor/light sources functional verification and filter artifacts/defects verification]||Day||0.5||C1||Liquid N2 refill is required in the cleanroom.||
    125125||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Internal alignment verification]||Day||4||C1||Liquid N2 refill is required in the cleanroom.||
    126126||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Internal tip-tilt loop verification]||Day||1||C1||Liquid N2 refill is required in the cleanroom.||
    127 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Motor/light sources functional verification and filter artifacts/defects verification]||Day||1.5||C1||Liquid N2 refill is required in the cleanroom.||
     127||P1.10||[wiki:/docs/CommissioningPlan/P1.10 NCPA routine verification]||Day||1.5||C1||Liquid N2 refill is required in the cleanroom.||
    128128||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C1 + C4||Liquid N2 refill is required in the cleanroom.||