Changes between Version 201 and Version 202 of docs/CommissioningPlan
- Timestamp:
- 05/14/21 18:43:38 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v201 v202 141 141 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||5||C3 + C4||Authorize SHARK-NIR on SX side. Permission to use the Argos Swing Arm. If not the Argos swing arm, RR will be required on the SX side. AO support.|| 142 142 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA]||Day||8||C3 + C4||Authorize SHARK-NIR on SX side. Permission to use the Argos Swing Arm. When not using the Argos swing arm and for different elevation angle tests, RR will be required on the SX side. AO support.|| 143 ||P2.65 / P3.12 / E1||[wiki:/docs/CommissioningPlan/P3.12 Star center Fourier mode images]||Day||1||C3||Authorize SHARK-NIR on SX side. Permission to use the Argos Swing Arm. When not using the Argos swing arm and for different elevation angle tests, RR will be required on the SX side. AO support.|| 143 144 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Checking pointing offset between SHARK-NIR and SOUL-AO]||Day||1||C3 + C4||Authorize SHARK-NIR on the SX side. RR mounted on the SX side. AO support.|| 144 145 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Redo science detector calibrations]||Day||1||C3 + C4||-|| 145 146 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Cryostat warm up check]||Day||2||C3||-|| 146 ||Total||(4 days of) contingency (15%) included within || ||3 2days || || ||147 ||Total||(4 days of) contingency (15%) included within || ||33 days || || || 147 148 148 149