  • docs/CommissioningPlan

    v1 v2  
    1717
    1818|| '''No.''' || '''Title''' || '''Number & Issue''' ||
    19 || AD1 || SHARK-NIR Schedule || SHARK-NIR-INAFP-Schedule-FDR Issue 0.3 ||
     19|| AD1 || SHARK-NIR Schedule || SHARK-NIR-INAFP-SCH-001_Issue 1.2.pdf ||
    2020|| AD2 || SHARK-NIR SW ICD || SHARK-NIR-INAFP-SW-ICD-FDR Issue 0.4 ||
    2121|| AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-IP-001 Issue 0.1 ||
     
    3535Each commissioning test/activity has a unified structure as follows:
    3636
    37 **Name of the commissioning activity**
    38  - **phase**: comes in which phase of the commissioning (1/2/3)
    39  - **status**: Reports the current status of the test (draft, final, complete)
    40  - **category**: one of the categories mentioned above
    41  - **recurrence**: Describes how frequently the test must be executed
    42  - **duration**: Estimates the time required to complete the test
    43 **Description**
     37-----
     38
     39{{{Name of the commissioning activity}}}
     40 - {{{phase}}}: states the phase of the commissioning (1/2/3)
     41 - {{{status}}}: reports the current status of the test (draft, final, complete)
     42 - {{{category}}}: one of the categories mentioned above
     43 - {{{recurrence}}}: describes how frequently the test must be executed
     44 - {{{duration}}}: estimates the time required to complete the test
     45{{{Description}}}
    4446•       Contains a general description of the test
    45 **Prerequisites**
     47{{{Prerequisites}}}
    4648•       Lists items that must be in place before the test begins
    47 **Procedure**
     49{{{Procedure}}}
    4850•       Explains in detail how to execute the test
    49 **Success Criteria**
     51{{{Success Criteria}}}
    5052•       Enumerates the outcome associates with successful completion of the test
    51 **Notes**
     53{{{Notes}}}
    5254•       Additional supporting information
    53 **LBTO Support**
     55{{{LBTO Support}}}
    5456•       Mention if (and what) support required from LBTO
    55 **Associated SHARK-NIR personnel**
     57{{{Associated SHARK-NIR personnel}}}
    5658•       Mentions here who are the associated personnel to the test
    57 **Date performed and by whom**
     59{{{Date performed and by whom}}}
    5860•       Mentions who performed the test and when
    59 
     61-----
    6062== Commissioning Activity ==
    6163In this section, you can see all the commissioning activities listed in chronological order. If you click the individual activity, you can see more details of it.