    203203|| ||**Total duration with 20% contingency**|| ||**4.2** nights|| || || ||
    204204|| ||**Total duration rounded up**|| ||**5** nights|| || || ||
    205 '' Phase 4 science verification of the observing cases (5-6*) can start after Run 3''
     205'' Phase 4 science verification of the observing cases (5-6) can start after Run 3''
    206206
    207207
     
    221221|| ||**Total duration with 20% contingency**|| ||**4.2** nights|| || || ||
    222222|| ||**Total duration rounded up**|| ||**5** nights|| || || ||
    223 '' Phase 4 science verification of the observing cases (8-13*) can start after Run 4''
     223'' Phase 4 science verification of the observing cases (8-13) can start after Run 4''
    224224
    225225
     
    234234|| ||**Total duration with 20% contingency**|| ||**3** nights|| || || ||
    235235|| ||**Total duration rounded up**|| ||**3** nights|| || || ||
    236 '' Phase 4 science verification of the observing cases (14-17*) can start after Run 5''
     236'' Phase 4 science verification of the observing cases (14-17) can start after Run 5''
    237237
    238238- ** Net Phase 3 Nights Requested = 24