Changes between Version 196 and Version 197 of docs/CommissioningPlan


Ignore:
Timestamp:
04/25/21 11:08:50 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v196 v197  
    3232|| '''#'''      || '''observing_case''' ||     
    3333|| OC1  ||      Direct imaging - pupil stabilized ||
    34 || OC2  ||      DBI - direct imaging - pupil stabilized ||
     34|| OC2  ||      DBI - Direct imaging - pupil stabilized ||
    3535|| OC3  ||      Direct imaging - field stabilized ||
    36 || OC4  ||      DBI - direct imaging - field stabilized ||
     36|| OC4  ||      DBI - Direct imaging - field stabilized ||
    3737|| OC5  ||      Coronagraphic imaging - GL - field stabilized ||
    3838|| OC6  ||      Coronagraphic imaging - GL - pupil stabilized ||
    3939|| OC7  ||      Coronagraphic imaging - FQPM - pupil stabilized ||
    4040|| OC8  ||      Coronagraphic imaging - SP1 - pupil stabilized ||
    41 || OC9  ||      DBI - coro imaging - SP1 - pupil stabilized ||
     41|| OC9  ||      DBI - Coronagraphic imaging - SP1 - pupil stabilized ||
    4242|| OC10 ||      Coronagraphic imaging - SP2 - pupil stabilized ||
    43 || OC11 ||      DBI - coro imaging - SP2 - pupil stabilized ||
     43|| OC11 ||      DBI - Coronagraphic imaging - SP2 - pupil stabilized ||
    4444|| OC12 ||      Coronagraphic imaging - SP3 - pupil stabilized ||
    45 || OC13 ||      DBI - coro imaging - SP3 - pupil stabilized ||
     45|| OC13 ||      DBI - Coronagraphic imaging - SP3 - pupil stabilized ||
    4646|| OC14 ||      LSS (R~100) close companion ||
    4747|| OC15 ||      LSS (R~800) distant companion ||
    4848|| OC16 ||      LSS (R~100) distant companion ||
    4949|| OC17 ||      LSS (R~800) close companion ||
    50 Note that technically and software-wise, there are no differences
    51 between (OC16 & OC17)  and (OC14 & OC15), and therefore not tested separately for Phase 3 nighttime commissioning.
     50Note that technically and software-wise, there are no differences between (OC16 & OC17)  and (OC14 & OC15), and therefore not tested separately for Phase 3 nighttime commissioning.
    5251
    5352In the table above, the acronyms mean the following:
     
    150149'''SHARK-NIR Location''': LBT platform. All nighttime activities. Some daytime support (within SHARK-NIR) is anticipated. Also, the SHARK-NIR software, SHINS, is expected to be almost ready to be tested.
    151150
    152 Phase 3 is further divided into 5 runs. Run 1 consists of essential common activities to every observing case. This will be the first to be tested on-sky. Run 2-5 blocks represent the nighttime technical commissioning of a set of 17 observing cases. For each of the observing cases, only one target will be tested. The contrast obtained from the data will be used as the merit function / success criterion. If contrast is not an option, a similar (or another) merit function will be used. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases.
    153 
    154 It is important to note that Run 2-5 are interchangeable. It is currently sorted to have the software complexity in the increasing order and also considering the science interest. Note that "Run N" does not mean that it is the Nth visit to the observatory. For example, Run 1 can be completed in 1 or 2 visits to the observatory, depending on the allotted time. Note also that, for individual runs (2-5), the time taken for other basic activities (such as moving from one target to another, setting up the telescope, closing the AO loop, etc.) are not explicitly mentioned in the table. For example, we anticipate, it may take between 10-20 minutes to move and set the telescope and close the AO loop from one target to another (numbers from the LUCI overheads table). This extra duration required will be mostly covered in the rounding up of the total nights.
     151Phase 3 is further divided into 5 runs. Run 1 consists of essential common activities essential for every observing case. This will be the first to be tested on-sky. Run 2-5 blocks represent the nighttime technical commissioning of a set of 17 observing cases. For each of the observing cases, only one target will be tested. The contrast obtained from the data will be used as the merit function / success criterion. If contrast is not an option, a similar (or another) merit function will be used. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases.
     152
     153It is important to note that Run 2-5 are interchangeable. It is currently sorted to have the software complexity in the increasing order and also considering the science interest. Note that "Run N" does not mean that it is the Nth visit to the observatory. For example, Run 1 can be completed in 1 or 2 visits to the observatory, depending on the allotted time. Note also that, for individual runs (2-5), the time taken for other basic activities (such as moving from one target to another, setting up the telescope, closing the AO loop, etc.) are not explicitly mentioned in the table. For example, we anticipate, it may take between 10-20 minutes to move and set the telescope and close the AO loop from one target to another (numbers from the LUCI overheads table). This extra duration required will be mostly covered within the 20% contingency and/or the rounding up of the total nights.
    155154
    156155Every evening of the nighttime commissioning, all the required calibrations (including dark, bias, flat-field, etc. for all the filters required) will be taken using the SHARK-NIR calibration unit.
     
    213212||P3.6 / C6||[wiki:/docs/CommissioningPlan/P3.6 PSF Alignment] (for SP, SP-X, SP-Y)||Night||2||good / medium||C5 + C6||AO support||
    214213||P3.5 / E4||[wiki:/docs/CommissioningPlan/P3.5 Orient the coronagraphs] (orient apodizers)||Night||1||bad||C5 + C6||AO support||
    215 ||P3.16 / E2||[wiki:/docs/CommissioningPlan/P3.16 Flux calibration (off-centered target observation)]  (for SP, SP-X, SP-Y))||Night||2||good / medium||C5 + C6||AO support||
     214||P3.16 / E2||[wiki:/docs/CommissioningPlan/P3.16 Flux calibration (off-centered target observation)]  (for SP, SP-X, SP-Y)||Night||2||good / medium||C5 + C6||AO support||
    216215||OC8||Coronagraphic imaging - SP1 - pupil stabilized||Night||3||good / medium||C5 + C7||AO support||
    217216||OC9||DBI - Coronagraphic imaging - SP1 - pupil stabilized||Night||3||good / medium||C5 + C7||AO support||
     
    237236'' Phase 4 science verification of the observing cases (14-17*) can start after Run 5''
    238237
    239 -** Net Phase 3 Nights Requested = 24
     238- ** Net Phase 3 Nights Requested = 24
    240239- When Phase 4 science verification completes, SHARK-NIR can be offered to the community under 'shared-risk'!!!
    241        
    242 =========
    243 
    244 
    245 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (nights)'''||'''Category'''||'''LBTO Support'''||
    246 ||P3.0||[wiki:/docs/CommissioningPlan/P3.0 Large spatial scale instrument and telescope flat field]||Twilight||2 hours||C5 + C6||-||
    247 ||P3.1||[wiki:/docs/CommissioningPlan/P3.1 Telescope control – sending preset]||Night||0.25||C5||-||
    248 ||P3.2||[wiki:/docs/CommissioningPlan/P3.2 Telescope control – telescope mode, offset, and focal plane geometry estimation]||Night||0.25||C5||-||
    249 ||P3.3||[wiki:/docs/CommissioningPlan/P3.3 SOUL-AO verification]||Night||1||C5 + C7||AO support||
    250 ||P3.4||[wiki:/docs/CommissioningPlan/P3.4 Pupil alignment]||Night||0.25||C5 + C6||AO support||
    251 ||P3.5||[wiki:/docs/CommissioningPlan/P3.5 Orient the coronagraphs]||Night||0.5||C5 + C6||AO support||
    252 ||P3.6||[wiki:/docs/CommissioningPlan/P3.6 PSF Alignment]||Night||0.25||C5 + C6||AO support||
    253 ||P3.7||[wiki:/docs/CommissioningPlan/P3.7 Verify the ADC rotation on sky]||Night||1||C5||AO support||
    254 ||P3.8||[wiki:/docs/CommissioningPlan/P3.8 Checking field-stabilized mode/bearing rotation service]||Night||0.25||C5||AO support||
    255 ||P3.9||[wiki:/docs/CommissioningPlan/P3.9 Internal TT loop working and performance]||Night||1||C5 + C7||AO support||
    256 ||P3.10||[wiki:/docs/CommissioningPlan/P3.10 NCPA working and performance & checking for pupil shifts]||Night||3||C5 + C7||AO support||
    257 ||P3.11||[wiki:/docs/CommissioningPlan/P3.11 Check the acquisition procedure]||Night||0.5||C5||AO support||
    258 ||P3.12||[wiki:/docs/CommissioningPlan/P3.12 Star center Fourier mode images]||Night||1||C5 + C6||AO support||
    259 ||P3.13||[wiki:/docs/CommissioningPlan/P3.13 Center the slit]||Night||2||C5||AO support||
    260 ||P3.14||[wiki:/docs/CommissioningPlan/P3.14 Sky background]||Night||0.25||C5 + C6||-||
    261 ||P3.15||[wiki:/docs/CommissioningPlan/P3.15 Astrometry plate scale and orientation]||Night||0.25||C5 + C6||AO support||
    262 ||P3.16||[wiki:/docs/CommissioningPlan/P3.16 Flux calibration (off-centered target observation)]||Night||0.25||C5 + C6||AO support||
    263 ||P3.17||[wiki:/docs/CommissioningPlan/P3.17 Instrumental throughput and absolute flux calibration]||Night||0.5||C5 + C6||AO support||
    264 ||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Atmospheric calibration and absolute flux calibration]||Night||0.5||C5 + C6||AO support||
    265 ||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Distortion map]||Night||0.5||C5 + C6||AO support||
    266 ||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Direct imaging + field stabilized mode testing]||Night||1||C5 + C7||AO support||
    267 ||P3.21||[wiki:/docs/CommissioningPlan/P3.21 Direct imaging + pupil stabilized mode testing]||Night||1||C5 + C7||AO support||
    268 ||P3.22||[wiki:/docs/CommissioningPlan/P3.22 Coronagraphic imaging + field stabilization mode testing]||Night||3||C5 + C7||AO support||
    269 ||P3.23||[wiki:/docs/CommissioningPlan/P3.23 Coronagraphic imaging + pupil stabilization mode testing]||Night||3||C5 + C7||AO support||
    270 ||P3.24||[wiki:/docs/CommissioningPlan/P3.24 Long-slit spectrograph mode testing]||Night||3||C5 + C7||AO support||
    271 ||Total||Contingency of 3 nights (10%) || ||24+2 = 26|| || ||
    272240
    273241=== Phase 4 (Science Verification / Early Science)===