Changes between Version 192 and Version 193 of docs/CommissioningPlan


Ignore:
Timestamp:
04/24/21 13:06:19 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v192 v193  
    1 = SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.1)=
     1= SHARK-NIR Commissioning Plan (SHARK-NIR-INAFP-COM-001 Issue 0.2)=
    22[[TOC(inline)]]
    33
    4 This commissioning planning document lays out and details the activities needed to bring SHARK-NIR online for 'shared-risk' scientific exploitation. The document incorporates activities starting from the unpacking of the boxes at the LBT mountain bay to the early science /science verification at its final destination on the LBT platform. Although called the commissioning document, it lists the pre-commissioning, commissioning, and science verification activities.
     4== Issue Change Record ==
     5|| '''Issue No.''' || '''Date''' || '''Section Affected''' || '''Reasons / Remarks''' || '''Initials''' ||
     6|| 0.1 || 02-Feb-2021 || All || New document || KRA ||
     7|| 0.2 || 24-Apr-2021 || All || updates in Phase 3 and 4, change in duration || KRA ||
    58
    6 The activities are classified into four phases:
     9== Introduction ==
     10This commissioning planning document lays out and details the activities needed to bring SHARK-NIR online for 'shared-risk' scientific exploitation. The document incorporates activities starting from the unpacking of the boxes at the LBT mountain bay to the early science / science verification at its final destination on the LBT platform. Although called the commissioning document, it lists the pre-commissioning, commissioning, and science verification activities. The activities are classified into four phases.  Phase 1 and 2 are purely daytime activities. Phase 3 and 4 are nighttime activities (with little daytime activity anticipated). It is to be noted that Phase 3 activities are classified into observing cases (combinations of individual science observing possibilities using various coronagraphs and modes, we have 17 of them) and '''not''' according to the observing modes (direct imaging, coronagraphic imaging, long-slit spectroscopy) anymore.
     11This allows starting Phase 4 (science verification) of those observing cases immediately after the competition of the respective Phase 3 commissioning run. See below for more details.
     12
    713 **Phase 1**: We start by inspecting the boxes at LBT mountain bay, unpacking, and installing the instrument at the mountain lab (clean room) for alignment verification and functionality checks. All of these are daytime activities. [Pre-commissioning: Unpack, assemble, and clean-room verification]. This forms the content of the PSR-09 Preliminary Laboratory Integration & Test (I&T) Procedure (at LBT).
    814
    915 **Phase 2**: The activities starting from the installation of SHARK-NIR at the SX central bent Gregorian focus of LBT, followed by preliminary functional checks, aligning SHARK-NIR to the telescope (daytime), and daytime closed dome engineering/technical testing. All of these are daytime activities. [Pre-commissioning: Installation, functional checks, and closed-dome testing]
    1016
    11  **Phase 3**: Phase 3 commences the nighttime commissioning, starting from sending preset to the telescope to testing individual SHARK-NIR observation modes for performance to the total SHARK-NIR performance. The final form of the SHARK-NIR software, observing blocks, data-reduction pipeline, etc., will be tested for all the modes (and sub-modes) of the instrument. All the activities are nighttime. However, some daytime activities may be anticipated as well. By the end of this phase, SHARK-NIR is ready for early science observations. [Commissioning]
     17 **Phase 3**: Phase 3 commences the nighttime commissioning, starting from sending preset to the telescope to testing individual SHARK-NIR observation modes for performance to the total SHARK-NIR performance. The final form of the SHARK-NIR software, observing blocks, data-reduction pipeline, etc., will be tested for all the observing cases of the instrument. All the activities are nighttime. However, some daytime activities may be anticipated as well. There will be a common run (Run 1) to test the basic common requirements for each of the observing cases. Run 2-5 blocks represent the nighttime technical commissioning of a set of 17 observing cases. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases.[Commissioning]
    1218
    1319 **Phase 4**: SHARK-NIR is ready for the final phase of the commissioning - the science verification / early science observations. The final performance of the SHARK-NIR will be analyzed using the data from this run. All the activities are nighttime. By the end of this phase, SHARK-NIR is ready for 'shared-risk' science. [Science Verification / Early Science]
     20
     21== Observing Cases ==
     22|| '''#'''      || '''observing_case''' ||     
     23|| OC1  ||      direct imaging - pupil stabilized ||
     24|| OC2  ||      DBI - direct imaging - pupil stabilized ||
     25|| OC3  ||      direct imaging - field stabilized ||
     26|| OC4  ||      DBI - direct imaging - field stabilized ||
     27|| OC5  ||      coro imaging - GL - field stabilized ||
     28|| OC6  ||      coro imaging - GL - pupil stabilized ||
     29|| OC7  ||      coro imaging - FQPM - pupil stabilized ||
     30|| OC8  ||      coro imaging - SP1 - pupil stabilized ||
     31|| OC9  ||      DBI - coro imaging - SP1 - pupil stabilized ||
     32|| OC10 ||      coro imaging - SP2 - pupil stabilized ||
     33|| OC11 ||      DBI - coro imaging - SP2 - pupil stabilized ||
     34|| OC12 ||      coro imaging - SP3 - pupil stabilized ||
     35|| OC13 ||      DBI - coro imaging - SP3 - pupil stabilized ||
     36|| OC14 ||      LSS (R~100) close companion ||
     37|| OC15 ||      LSS (R~800) distant companion ||
     38|| OC16 ||      LSS (R~100) distant companion ||
     39|| OC17 ||      LSS (R~800) close companion ||
     40Note: OC16 and OC17 are LSS modes. Technically and SW-wise, there are no differences
     41between them and (OC14 & OC15), and therefore not tested separately for Phase 3 nighttime commissioning.
     42{{{
     43DBI - Dual Band Imaging.
     44GL - Gaussian Lyot.
     45FQPM - Four Quadrant Phase Mask.
     46SP(1,2,3) - Shaped Pupil (symmetric, X, Y).
     47LSS - Long Slit Spectroscopy.
     48}}}
    1449