Changes between Version 161 and Version 162 of docs/CommissioningPlan
- Timestamp:
- 02/04/21 13:00:23 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v161 v162 136 136 ||P3.18||[wiki:/docs/CommissioningPlan/P3.18 Atmospheric calibration and absolute flux calibration]||Night||0.5||C6||AO support|| 137 137 ||P3.19||[wiki:/docs/CommissioningPlan/P3.19 Distortion map]||Night||1||C6||AO support|| 138 ||Total||Contingency included within|| ||19|| || ||138 ||Total||Contingency of 2 nights|| ||19+2 = 21|| || || 139 139 140 140 === Phase 4 (Science Verification / Early Science)=== … … 157 157 ||P4.13||[wiki:/docs/CommissioningPlan/P4.13 Solar system: Size and shape of main-belt astroids]||Night||1||C8||AO support|| 158 158 ||P4.14||[wiki:/docs/CommissioningPlan/P4.14 Solar system: Surface heterogeneity of trans-neptunian objects]||Night||1||C8||AO support|| 159 ||Total|| Contingency included within|| ||36|| || ||159 ||Total||(2 days of) contingency included within|| ||36|| || || 160 160 161 161 == Additional Information ==