Changes between Version 145 and Version 146 of docs/CommissioningPlan
- Timestamp:
- 02/03/21 17:55:43 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v145 v146 86 86 ||P1.5||[wiki:/docs/CommissioningPlan/P1.5 Start all the services and initialize all the motors]||Day||1||C1||-|| 87 87 ||P1.6||[wiki:/docs/CommissioningPlan/P1.6 Cool down the cryostat]||Day||1||C1||Liquid N2 fill in the cleanroom|| 88 ||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Verification of the operability of the motors and light sources]||Day||0.5||C1||optical bench needed in the cleanroom, Liquid N2 fill in the cleanroom||88 ||P1.7||[wiki:/docs/CommissioningPlan/P1.7 Check the working of the internal NCPA routine]||Day||0.5||C1||optical bench needed in the cleanroom, Liquid N2 fill in the cleanroom|| 89 89 ||P1.8||[wiki:/docs/CommissioningPlan/P1.8 Verification of the internal alignment of the instrument]||Day||4||C1||optical bench needed in the cleanroom, Liquid N2 fill in the cleanroom|| 90 ||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Science detector calibrations]||Day||1||C1||Liquid N2 fill in the cleanroom||91 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C1||LBTO SW support maybe required, Liquid N2 fill in the cleanroom||92 ||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Check the working of the internal NCPA routine and looking for filter defects/artifacts]||Day||1||C1||Liquid N2 fill in the cleanroom||90 ||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Check the working of the internal tip-tilt loop]||Day||1||C1||Liquid N2 fill in the cleanroom|| 91 ||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Verification of the operability of the motors & light sources and looking for filter defects/artifacts]||Day||1.5||C1||LBTO SW support maybe required, Liquid N2 fill in the cleanroom|| 92 ||P1.11||[wiki:/docs/CommissioningPlan/P1.11 Science detector calibrations]||Day||1||C1||Liquid N2 fill in the cleanroom|| 93 93 ||P1.12||[wiki:/docs/CommissioningPlan/P1.12 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C1||-|| 94 94 ||Total||Contingency included within|| ||13.5|| || ||