Changes between Version 141 and Version 142 of docs/CommissioningPlan
- Timestamp:
- 02/02/21 14:23:18 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v141 v142 27 27 The table below lists the categories of commissioning activities. 28 28 ||'''Category Name'''||'''Category Number'''|| 29 ||Unpack, Assemble, Verification||C1||29 ||Unpack, Assemble, and Verification||C1|| 30 30 ||Installation of SHARK-NIR at LBT platform|| C2 || 31 31 ||Daytime testing (functionality and operability)||C3||