docs/CommissioningPlan
v125 v126 102 102 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 Measurement of NCPA]||Day||5+5||C2 + C3||Authorize SHARK-NIR on SX side. Permission to use the Argos Swing Arm. When not using Argos swing arm and for different elevation angle tests, RR will be required on the SX side. Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO|| 103 103 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Checking pointing offset between SHARK-NIR and SOUL-AO]||Day||3||C2||Mounting RR on the SX side. Support on running SOUL AO|| 104 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Looking for filter defects/ effects/features + Science detector calibrations repeat]||Day||2||C2||Mounting RR on the SX side. Support on running SOUL AO||104 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Looking for filter defects/artifacts + Science detector calibrations repeat]||Day||2||C2||-|| 105 105 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Flexure tests]||Day||3||C2 + C3||Mounting RR on the SX side. Support on running SOUL AO, the telescope need to move in elevation|| 106 106 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Cryostat warm up check]||Day||2||C2||-||