Changes between Version 118 and Version 119 of docs/CommissioningPlan


Ignore:
Timestamp:
01/25/21 12:59:48 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v118 v119  
    8888||P1.9||[wiki:/docs/CommissioningPlan/P1.9 Science detector calibrations]||Day||1||C1||Liquid N2 fill in the cleanroom||
    8989||P1.10||[wiki:/docs/CommissioningPlan/P1.10 Testing of SCICAM image grabbing by SOUL-AO]||Day||2||C1||LBTO SW support maybe required, Liquid N2 fill in the cleanroom||
    90 ||Total||Contigency of 1 day|| ||11+1=12|| || ||
     90||Total||Contingency included within|| ||11|| || ||
    9191
    9292=== Phase 2 (Pre-commissioning)===