Changes between Version 116 and Version 117 of docs/CommissioningPlan


Ignore:
Timestamp:
01/22/21 10:04:10 (4 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan

    v116 v117  
    1717
    1818|| '''No.''' || '''Title''' || '''Number & Issue''' ||
    19 || AD1 || SHARK-NIR Schedule || SHARK-NIR-INAFP-SCH-001_Issue 1.2.pdf ||
    20 || AD2 || SHARK-NIR SW ICD || SHARK-NIR-INAFP-SW-ICD-FDR Issue 0.4 ||
    21 || AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-IP-001 Issue 0.2 ||
    22 || AD4 || SHARK-NIR Calibrations || SHARK-NIR-INAFP-MAN-004 ||
    23 || AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 ||
     19|| AD1 || SHARK-NIR Schedule || SHARK-NIR-INAFP-SCH-001_Issue 1.3 ||
     20|| AD2 || SHARK-NIR SHINS Interface Control Document || SHARK-NIR-INAFP-ICD-002 Issue 0.4 ||
     21|| AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-MAN-001 Issue 2.0 ||
     22|| AD4 || SHARK-NIR Calibration Procedures || SHARK-NIR-INAFP-MAN-004 Issue 0.2 ||
     23|| AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 Issue 1.0 ||
    2424
    2525== Category  ==