Changes between Version 114 and Version 115 of docs/CommissioningPlan
- Timestamp:
- 01/21/21 13:10:38 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v114 v115 109 109 === Phase 3 (Commissioning)=== 110 110 '''SHARK-NIR Location''': LBT platform. All nighttime activities. Some daytime support (within SHARK-NIR) is anticipated. Also, the SHARK-NIR software, SHINS, is expected to be almost ready to be tested. 111 112 Every evening of the nighttime commissioning, all the required calibrations (including dark, bias, flat-field, etc. for all the filters required) will be taken using the SHARK-NIR calibration unit. 111 113 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (hours)'''||'''Category'''||'''LBTO Support'''|| 112 114 ||P3.0||[wiki:/docs/CommissioningPlan/P3.0 Large spatial scale instrument and telescope flat field]||Twilight||2||C5||-|| … … 134 136 === Phase 4 (Science Verification / Early Science)=== 135 137 '''SHARK-NIR Location''' : LBT platform. All nighttime activities. Some daytime support (within SHARK-NIR) is anticipated. SHINS is tested and working properly. Only tweaking or parameter adjustment, if any, is expected from SHINS at this stage. 138 139 Every evening of the nighttime commissioning, all the required calibrations (including dark, bias, flat-field, etc. for all the filters required) will be taken using the SHARK-NIR calibration unit. 136 140 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (nights)'''||'''Category'''||'''LBTO Support'''|| 137 141 ||P4.1||[wiki:/docs/CommissioningPlan/P4.1 Direct imaging + field stabilized mode testing]||Night||1.5||C4 + C6||AO support||