Changes between Version 112 and Version 113 of docs/CommissioningPlan
- Timestamp:
- 01/20/21 14:56:32 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan
v112 v113 14 14 15 15 16 Note that the corresponding evolving doc in the SHARK-NIR Dropbox folder is **SHARK-NIR-INAFP-COM-001_CommissioningPlan.docx**. There is also an excel file listing the activities titled **SHARK-NIR-INAFP-COM-002_CommissioningActivityList.xlsx** (BOTH NOT UPDATED).17 18 16 == Applicable Documents (needs update)== 19 17 … … 23 21 || AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-IP-001 Issue 0.2 || 24 22 || AD4 || SHARK-NIR Calibrations || SHARK-NIR-INAFP-MAN-004 || 23 || AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 || 25 24 26 25 == Category == … … 152 151 ||Total||Contingency included within|| ||36|| || || 153 152 154 Note: The duration mentioned in Phase 4 will be changed to hours later.153 Note: The duration mentioned in Phase 4 will be later changed to hours. 155 154 156 155 == Additional Information == … … 159 158 1. Other performance activities, if any 160 159 2. Look-up tables, if any 160 161 162 Note that the corresponding evolving doc in the SHARK-NIR Dropbox folder is **SHARK-NIR-INAFP-COM-001_CommissioningPlan.docx**. There is also an excel file listing the activities titled **SHARK-NIR-INAFP-COM-002_CommissioningActivityList.xlsx** (BOTH NOT UPDATED). 163 161 164 162 165 == Comments ==