  • docs/CommissioningPlan

    v112 v113  
    1414
    1515
    16 Note that the corresponding evolving doc in the SHARK-NIR Dropbox folder is **SHARK-NIR-INAFP-COM-001_CommissioningPlan.docx**. There is also an excel file listing the activities titled **SHARK-NIR-INAFP-COM-002_CommissioningActivityList.xlsx** (BOTH NOT UPDATED).
    17 
    1816== Applicable Documents (needs update)==
    1917
     
    2321|| AD3 || SHARK-NIR Installation Plan || SHARK-NIR-INAFP-IP-001 Issue 0.2 ||
    2422|| AD4 || SHARK-NIR Calibrations || SHARK-NIR-INAFP-MAN-004 ||
     23|| AD5 || SHARK-NIR System Design Analysis ||SHARK-NIR-INAFP-SDA-001 ||
    2524
    2625== Category  ==
     
    152151||Total||Contingency included within|| ||36|| || ||
    153152
    154 Note: The duration mentioned in Phase 4 will be changed to hours later.
     153Note: The duration mentioned in Phase 4 will be later changed to hours.
    155154
    156155== Additional Information  ==
     
    159158 1. Other performance activities, if any
    160159 2. Look-up tables, if any
     160
     161
     162Note that the corresponding evolving doc in the SHARK-NIR Dropbox folder is **SHARK-NIR-INAFP-COM-001_CommissioningPlan.docx**. There is also an excel file listing the activities titled **SHARK-NIR-INAFP-COM-002_CommissioningActivityList.xlsx** (BOTH NOT UPDATED).
     163
    161164
    162165== Comments ==