wiki:docs/CommissioningPlan/SDC9

Version 1 (modified by kradhakrishnan, 4 years ago) (diff)

--

SDC9 Filter wheels reproducibility monitoring

  • Phase : Any
  • Status : Draft
  • Category : Daytime calibration (C3)
  • Recurrence : once every 6 months starting from commissioning.
  • Duration : 20 minutes

Description

  • Estimate the positioning accuracy of the filter wheels.

Prerequisites

  • Bad pixel map, Background or Dark, Flat-field, distortion map

Procedure

  • For each given position of the filter, take an image in pupil imaging mode.

Success criteria

  • expected accuracy of 0.1 pixel.

Notes

  • Same as activity 9.7 in AD4

LBTO support

Associated SHARK-NIR personnel

Date performed and by whom