Version 5 (modified by kradhakrishnan, 3 years ago) (diff) |
---|
SDC7 Spectral resolution
- Phase : Any
- Status : Draft
- Category : Daytime calibration (C3)
- Recurrence : once every month starting from commissioning.
- Duration : 20 minutes
Description
- Measure the spectral resolution for the LSS observing mode.
Prerequisites
- Bad pixel map, Background frames
Procedure
- This calibration is performed illuminating the slit with the instrument spectral calibration lamps with known characteristics (5 emission lines). A background with lamps switched off is required.
Templates
- SHARKNIR_lss_mon_SpectraResolution (not released)
Success criteria
- Accuracy of MRS: 0.5 nm at 1.2 um, LRS: 2 nm at 1.2 um.
Notes
- Same as activity 9.4 in AD4
LBTO support
Date performed and by whom