Changes between Version 2 and Version 3 of docs/CommissioningPlan/SDC7


Ignore:
Timestamp:
01/14/22 13:17:45 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/SDC7

    v2 v3  
    11 == SDC7 Spectral resolution ==
    2 •       **Phase**               :       Any 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Daytime calibration (C3)
    5 •       **Recurrence**  :       once every month starting from commissioning.
    6 •       **Duration**            :       10 minutes
     2
     3- **Phase**             :       Any 
     4- **Status**            :       Draft   
     5- **Category**  :       Daytime calibration (C3)
     6- **Recurrence**        :       once every month starting from commissioning.
     7- **Duration**  :       20 minutes
     8
    79**Description**
    8 •       Measure the spectral resolution for the LSS observing mode.
     10- Measure the spectral resolution for the LSS observing mode.
     11
    912**Prerequisites**
    10 •       Bad pixel map, Background frames
     13- Bad pixel map, Background frames
     14
    1115**Procedure**
    12 •       This calibration is performed illuminating the slit with the instrument spectral calibration lamps with known characteristics (5 emission lines). A background with lamps switched off is required.
     16- This calibration is performed illuminating the slit with the instrument spectral calibration lamps with known characteristics (5 emission lines). A background with lamps switched off is required.
     17
    1318**Success criteria**
    14 •       Accuracy of MRS: 0.5nm at 1.2 micron, LRS: 2 nm at 1.2 micron.
     19- Accuracy of MRS: 0.5 nm at 1.2 um, LRS: 2 nm at 1.2 um.
     20
     21**Templates**
     22
    1523**Notes**
    16 •       Same as activity 9.4 in AD4
     24- Same as activity 9.4 in AD4
     25
    1726**LBTO support**
    1827
    19 **Associated SHARK-NIR personnel**
    20 
    2128**Date performed and by whom**
    22 
    23 **Comments**
    24 
    25 MB: If this happens in clean room at LBT, it might not be repeated in daytime commissioning, correct? maybe put 20 minutes
    26 -