Changes between Version 2 and Version 3 of docs/CommissioningPlan/P4.5


Ignore:
Timestamp:
01/19/21 19:01:04 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P4.5

    v2 v3  
    66•       **Duration**            :       2 night(s)
    77**Description**
    8 •       
     8•       Dedicated to check the complete procedure and running of the OB scripts through SHINS for all the combinations of this observing mode.
    99**Prerequisites**
    1010•       Authorize SHARK-NIR on the SX side.
     
    3232**Associated SHARK-NIR personnel**
    3333       
     34
    3435**Date performed and by whom**