== P3.8 Checking field-stabilized mode/bearing rotation service == • **Phase** : 3 • **Status** : Draft • **Category** : Nighttime testing (functionality and operability) (C4) • **Recurrence** : once at commissioning • **Duration** : 2 hours **Description** • The field stabilized mode or in other words, the working of the bearing tracking service will be tested. **Prerequisites** • Atmospheric conditions: AO working conditions. • Authorize SHARK-NIR on the SX side. • Targets (star cluster) near zenith and horizon (say airmass of 2). **Procedure** • Select the target near airmass 2. There should be stars spread across the entire SCICAM, preferably close to the edges as well. • Start the bearing tracking services (field-stabilized mode). • Take short-exposure images for a duration of ##minutes. • Check if the positions of these stars. • Repeat the same for the target close to the zenith. • The above may be repeated for a target where the rotation of the bearing is in the opposite direction as of the above tested one. **Success criteria** • The bearing tracking service works well and the field is stabilized within the precision needed. **Notes** **LBTO support** • SOUL-AO support **Associated SHARK-NIR personnel** **Date performed and by whom**