wiki:docs/CommissioningPlan/P3.7

Version 6 (modified by kradhakrishnan, 3 years ago) (diff)

--

P3.7 Checking field-stabilized mode/bearing rotation service

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C5)
  • Recurrence : once at commissioning
  • Duration : 2 hours

Description

  • The field stabilized mode, or in other words, the working of the bearing tracking service, will be tested.

Prerequisites

  • Atmospheric conditions: AO working conditions.
  • Authorize SHARK-NIR on the SX side.
  • Targets (star cluster) near zenith and horizon (say airmass of 2).

Procedure

  • Select the target near airmass 2. There should be stars spread across the entire SCICAM, preferably close to the edges as well.
  • Start the bearing tracking services (field-stabilized mode).
  • Take short-exposure images for a duration of ##minutes.
  • Check the positions of these stars.
  • Repeat the same for the target close to the zenith.
  • Repeat the same steps for a target where the rotation of the bearing is in the opposite direction.

Templates

Success criteria

  • The bearing tracking service works well, and the field is stabilized within the precision needed.

Notes

LBTO support

  • AO support

Date performed and by whom