wiki:docs/CommissioningPlan/P3.7

Version 3 (modified by kradhakrishnan, 4 years ago) (diff)

--

P3.7 Verify the ADC rotation on sky

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C5)
  • Recurrence : once at commissioning
  • Duration : 2 nights

Description

  • Evaluate

Prerequisites

  • Atmospheric conditions: photometric.
  • Authorize SHARK-NIR on the SX side.
  • Photometric stars as targets for every filter.
  • AO working.
  • Target(s) at different Zenith distances?

Procedure

  • Check the working of the ADC using different targets in varying zenith distances and observing using different science filters?

Success criteria

  • xxx

Notes

LBTO support

  • SOUL-AO support

Associated SHARK-NIR personnel

Date performed and by whom