Changes between Version 1 and Version 2 of docs/CommissioningPlan/P3.7
- Timestamp:
- 01/19/21 14:38:55 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.7
v1 v2 1 == P3.7 Estimate the instrument throughput==1 == P3.7 Verify the ADC rotation on sky == 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 50 minutes6 • **Duration** : 4 hours 7 7 **Description** 8 • Knowing the magnitude of the acquired star, the throughput of the instrument is verified for all the scientific filters.8 • Evaluate 9 9 **Prerequisites** 10 10 • Atmospheric conditions: photometric. … … 12 12 • Photometric stars as targets for every filter. 13 13 • AO working. 14 • Target(s) at different Zenith distances? 14 15 **Procedure** 15 • Take unsaturated images of the photometric star for every science filter. 16 • Estimate the instrument throughput for every filter. 16 • Check the working of the ADC using different targets in varying zenith distances and observing using different science filters? 17 17 **Success criteria** 18 • The instrument throughput for every filter is estimated and note down.18 • xxx 19 19 **Notes** 20 20 21 **LBTO support** 21 • Support from LBTI/LBTO? 22 • Presence of John Hill usually helps while collimating for the first time. 23 • Steve Allenson (as the TO) will be a great asset too. 22 • SOUL-AO support 24 23 **Associated SHARK-NIR personnel** 25 • JF, LM, MdP, MM (from AZ), DV? 24 26 25 **Date performed and by whom**