Changes between Version 4 and Version 5 of docs/CommissioningPlan/P3.6
- Timestamp:
- 02/04/21 22:44:51 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.6
v4 v5 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 5 5 • **Recurrence** : before every observing target (CI, LSS), starting from commissioning. 6 • **Duration** : 3.5 hours6 • **Duration** : 1 night 7 7 **Description** 8 8 • Alignment of the PSF with occulter (or slit) in coronagraphic mode. … … 12 12 • The position of the internal deformable mirror (TTM_DM) is optimized in order to have the PSF image on the intermediate focal plane centered with the occulter. This is obtained comparing the PSF image, formed on the SCICAM, with the image of the occulter, obtained on the SCICAM using the calibration flat-field source. 13 13 **Success criteria** 14 • the expected accuracy of 0.2 pixel (DV: need to check if we can reach this).14 • the expected accuracy of 0.2 pixels (DV: need to check if we can reach this). 15 15 **Notes** 16 16 • Same as activity 8.3 in AD4