Changes between Version 5 and Version 6 of docs/CommissioningPlan/P3.4
- Timestamp:
- 01/26/21 12:12:28 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.4
v5 v6 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : before every observing target (CI, LSS), starting from commissioning. 6 • **Duration** : 30 minutes6 • **Duration** : 2.5 hours 7 7 **Description** 8 • Alignment of the internal pupil image (PP1) with apodizerin the coronagraphic mode8 • Alignment of the internal pupil image (PP1)with apodizer [and Lyot stop at PP2]in the coronagraphic mode 9 9 **Prerequisites** 10 10 • Bad pixel map, Background or Dark, Flat-field, detector RON … … 22 22 23 23 **Date performed and by whom** 24 25 **Comment** 26 27 KR, EC, DV: Should we do this also for Lyot Stops (Lyot_Grism_W) or PP2? Do we need to do the pupil alignment for the Prism or Grism (we think not)? Considering 5 cases (3 + 2) and 30 mins / case, we put 2.5 hours in total above.