Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.4


Ignore:
Timestamp:
01/19/21 11:33:44 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.4

    v3 v4  
    44•       **Category**            :       Nighttime testing (functionality and operability) (C4)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       1 hour(s)
     6•       **Duration**            :       1 night
    77**Description**
    88•       For the correct telescope mode for SHARK-NIR, find the offset direction & magnitude (for the field-stabilized mode), verify the proper image orientation, pixel scale, field of view, and distortion at the SCICAM. Note that this may be performed with and without AO running.