Changes between Version 1 and Version 2 of docs/CommissioningPlan/P3.4


Ignore:
Timestamp:
01/11/21 12:11:39 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.4

    v1 v2  
    66•       **Duration**            :       1 hour(s)
    77**Description**
    8 •       Verify the proper image orientation, pixel scale, field of view, and distortion at the SCICAM. Note that this may be performed with and without AO running.
     8•       For the correct telescope mode for SHARK-NIR, find the offset direction & magnitude (for the field-stabilized mode), verify the proper image orientation, pixel scale, field of view, and distortion at the SCICAM. Note that this may be performed with and without AO running.
    99**Prerequisites**
    1010•       Atmospheric conditions: should be able to see bight stars on sky (preferably close to zenith?).