Changes between Version 9 and Version 10 of docs/CommissioningPlan/P3.4
- Timestamp:
- 02/04/21 22:42:22 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.4
v9 v10 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 5 5 • **Recurrence** : before every observing target (CI, LSS), starting from commissioning. 6 • **Duration** : 2.5 hours6 • **Duration** : 1 night 7 7 **Description** 8 8 • Alignment of the internal pupil image with apodizer (at PP1) or Lyot stop (at PP2) in the coronagraphic mode