    1  == P3.31       Pupil alignment ==
     1 == P3.4        Pupil alignment ==
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    44•       **Category**            :       Nighttime testing (functionality and operability) (C4)
    55•       **Recurrence**  :       before every observing target (CI, LSS), starting from commissioning.
    6 •       **Duration**            :       <5 minutes
     6•       **Duration**            :       30 minutes
    77**Description**
    88•       Alignment of the internal pupil image (PP1) with apodizer in the coronagraphic mode
     
    1616•       Same as activity 8.2 in AD4
    1717**LBTO support**
    18 •       Support from LBTI/LBTO?
     18
     19
    1920**Associated SHARK-NIR personnel**
    20 •       JF, LM, MdP
     21
     22
    2123**Date performed and by whom**