Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.2


Ignore:
Timestamp:
02/04/21 21:37:39 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.2

    v3 v4  
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C4)
     4•       **Category**            :       Nighttime testing (functionality and operability) (C5)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       1 hour
     6•       **Duration**            :       2 hours
    77**Description**
    88•       For the correct telescope mode for SHARK-NIR, find the offset direction & magnitude (for the field-stabilized mode), verify the proper image orientation, pixel scale, field of view, and distortion at the SCICAM. Note that this may be performed with and without AO running.
    99**Prerequisites**
    10 •       Atmospheric conditions: should be able to see bight stars on sky (preferably close to zenith?).
     10•       Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?).
    1111•       Authorize SHARK-NIR on the SX side.
    1212•       Suitable binary or astrometric targets.
     
    3232•       The image orientation is as expected. The pixel scale and field of view of the SCICAM are as expected.
    3333**Notes**
     34
    3435**LBTO support**
    3536•       Support from telescope operator (if needed).