wiki:docs/CommissioningPlan/P3.27

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P3.27 Spectral resolution

  • Phase : 3
  • Status : Draft
  • Category : Daytime calibration (C3)
  • Recurrence : once every month starting from commissioning.
  • Duration : 10 minutes

Description

  • Measure the spectral resolution for the LSS observing mode.

Prerequisites

  • Bad pixel map, Background frames

Procedure

  • This calibration is performed illuminating the slit with the instrument spectral calibration lamps with known characteristics (5 emission lines). A background with lamps switched off is required.

Success criteria

  • Accuracy of MRS: 0.5nm at 1.2 micron, LRS: 2 nm at 1.2 micron.

Notes

  • Same as activity 9.4 in AD4

LBTO support

  • Support from LBTI/LBTO?

Associated SHARK-NIR personnel

  • JF, LM, MdP

Date performed and by whom