Changes between Version 1 and Version 2 of docs/CommissioningPlan/P3.25


Ignore:
Timestamp:
04/23/22 20:47:51 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.25

    v1 v2  
    1  == P3.25       Detector gain ==
    2 •       **Phase**               :       3 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Daytime calibration (C3)
    5 •       **Recurrence**  :       once every month starting from commissioning.
    6 •       **Duration**            :       20 minutes
    7 **Description**
    8 •       Monitor detector gain factor, RON, and non-linearity over time.
    9 **Prerequisites**
    10 •       Instrument and dome closed
    11 **Procedure**
    12 •       This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s.
    13 •       Continuous extended source in the calibration; various ND; various integration times. CI in B_H.
    14 **Success criteria**
    15 •       5% expected accuracy.
    16 **Notes**
    17 •       Same as activity 9.2 in AD4
    18 **LBTO support**
    19 •       Support from LBTI/LBTO?
    20 **Associated SHARK-NIR personnel**
    21 •       JF, LM, MdP
    22 **Date performed and by whom**