Changes between Initial Version and Version 1 of docs/CommissioningPlan/P3.25


Ignore:
Timestamp:
03/05/20 13:37:49 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.25

    v1 v1  
     1 == P3.25       Detector gain ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime calibration (C3)
     5•       **Recurrence**  :       once every month starting from commissioning.
     6•       **Duration**            :       20 minutes
     7**Description**
     8•       Monitor detector gain factor, RON, and non-linearity over time.
     9**Prerequisites**
     10•       Instrument and dome closed
     11**Procedure**
     12•       This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s.
     13•       Continuous extended source in the calibration; various ND; various integration times. CI in B_H.
     14**Success criteria**
     15•       5% expected accuracy.
     16**Notes**
     17•       Same as activity 9.2 in AD4
     18**LBTO support**
     19•       Support from LBTI/LBTO?
     20**Associated SHARK-NIR personnel**
     21•       JF, LM, MdP
     22**Date performed and by whom**