Changes between Version 5 and Version 6 of docs/CommissioningPlan/P3.24


Ignore:
Timestamp:
04/23/22 20:46:00 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.24

    v5 v6  
    1 == 3.24 Long-slit spectrograph mode testing      ==
    2 •       **Phase**               :       3 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7)
    5 •       **Recurrence**  :       once
    6 •       **Duration**            :       3 night(s)
    7 **Description**
    8 •       Dedicated to check the complete procedure and running of the OB scripts through SHINS for all the combinations of this observing mode.
    9 **Prerequisites**
    10 •       Authorize SHARK-NIR on the SX side.
    11 •       Atmospheric conditions: ?
    12 •       Atmospheric conditions: ?
    13 •       Bad pixel map, Background or Dark, Flat-field, distortion map
    14 •       Cloud Cover             :
    15 •       Astronomical Seeing     :
    16 •       Sky Background  : Any / Bright
    17 •       Water Vapor             : Any
    18 •       Timing Windows  :
    19 •       Observing Targets       :
    20 •       Observing Filters       :
    21 •       Detector Mode, DIT:
    22 •       Daytime Calibration Data required:
    23 •       Nighttime Calibration Data required:
    24 
    25 **Procedure**
    26 •       TBD
    27 **Notes**
    28 * Note that the data from this testing activity may be good enough to be considered as a science verification one.
    29 
    30 **LBTO support**
    31 •       AO support
    32 
    33 **Associated SHARK-NIR personnel**
    34        
    35 
    36 **Date performed and by whom**