wiki:docs/CommissioningPlan/P3.20

Version 2 (modified by kradhakrishnan, 4 years ago) (diff)

--

3.21 Direct imaging + field stabilized mode testing

  • Phase : 4
  • Status : Draft
  • Category : Nighttime testing for functionality, operability, and performance (C5 + C7)
  • Recurrence : once
  • Duration : 1.5 night(s)

Description

  • Dedicated to check the complete procedure and running of the OB scripts through SHINS for all the combinations of this observing mode.

Prerequisites

  • Authorize SHARK-NIR on the SX side.
  • Atmospheric conditions: ?
  • Atmospheric conditions: ?
  • Bad pixel map, Background or Dark, Flat-field, distortion map
  • Cloud Cover :
  • Astronomical Seeing :
  • Sky Background : Any / Bright
  • Water Vapor : Any
  • Timing Windows :
  • Observing Targets :
  • Observing Filters :
  • Detector Mode, DIT:
  • Daytime Calibration Data required:
  • Nighttime Calibration Data required:

Procedure

  • TBD

Notes

LBTO support

  • SOUL-AO support

Associated SHARK-NIR personnel

Date performed and by whom