Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.1
- Timestamp:
- 02/04/21 21:36:37 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.1
v3 v4 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 30 mins6 • **Duration** : 2 hours 7 7 **Description** 8 8 • Preset of a bright enough on-axis star is sent to the telescope for verifying the communication to TCS, nighttime collimation model for SHARK-NIR, and the pointing accuracy. 9 9 **Prerequisites** 10 • Atmospheric conditions: should be able to see b ight stars on the sky (preferably close to zenith?).10 • Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?). 11 11 • Authorize SHARK-NIR on the SX side. 12 12 **Procedure** … … 16 16 • Successful in sending preset to the telescope and therefore the communication with LBT TCS. 17 17 **Notes** 18 18 19 **LBTO support** 19 20 • Presence of John Hill usually helps while collimating for the first time.