Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.1


Ignore:
Timestamp:
02/04/21 21:36:37 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.1

    v3 v4  
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C4)
     4•       **Category**            :       Nighttime testing (functionality and operability) (C5)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       30 mins
     6•       **Duration**            :       2 hours
    77**Description**
    88•       Preset of a bright enough on-axis star is sent to the telescope for verifying the communication to TCS, nighttime collimation model for SHARK-NIR, and the pointing accuracy.
    99**Prerequisites**
    10 •       Atmospheric conditions: should be able to see bight stars on the sky (preferably close to zenith?).
     10•       Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?).
    1111•       Authorize SHARK-NIR on the SX side.
    1212**Procedure**
     
    1616•       Successful in sending preset to the telescope and therefore the communication with LBT TCS.
    1717**Notes**
     18
    1819**LBTO support**
    1920•       Presence of John Hill usually helps while collimating for the first time.