Changes between Version 2 and Version 3 of docs/CommissioningPlan/P3.1
- Timestamp:
- 01/19/21 14:05:34 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.1
v2 v3 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : half a night6 • **Duration** : 30 mins 7 7 **Description** 8 8 • Preset of a bright enough on-axis star is sent to the telescope for verifying the communication to TCS, nighttime collimation model for SHARK-NIR, and the pointing accuracy.