Changes between Version 1 and Version 2 of docs/CommissioningPlan/P3.1
- Timestamp:
- 01/19/21 11:33:25 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.1
v1 v2 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 10 minutes6 • **Duration** : half a night 7 7 **Description** 8 8 • Preset of a bright enough on-axis star is sent to the telescope for verifying the communication to TCS, nighttime collimation model for SHARK-NIR, and the pointing accuracy. … … 17 17 **Notes** 18 18 **LBTO support** 19 • Support from LBTI/LBTO?20 19 • Presence of John Hill usually helps while collimating for the first time. 21 • Steve Allenson (as the TO) will be a great asset too. 20 22 21 **Associated SHARK-NIR personnel** 23 • JF, LM, MdP, MM (from AZ), DV? 22 23 24 24 **Date performed and by whom**