    44•       **Category**            :       Nighttime testing (functionality and operability) (C4)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       10 minutes
     6•       **Duration**            :       half a night
    77**Description**
    88•       Preset of a bright enough on-axis star is sent to the telescope for verifying the communication to TCS, nighttime collimation model for SHARK-NIR, and the pointing accuracy.
     
    1717**Notes**
    1818**LBTO support**
    19 •       Support from LBTI/LBTO?
    2019•       Presence of John Hill usually helps while collimating for the first time.
    21 •       Steve Allenson (as the TO) will be a great asset too.
     20
    2221**Associated SHARK-NIR personnel**
    23 •       JF, LM, MdP, MM (from AZ), DV?
     22
     23
    2424**Date performed and by whom**