wiki:docs/CommissioningPlan/P3.19

Version 8 (modified by kradhakrishnan, 3 years ago) (diff)

--

P3.18 Atmospheric calibration and absolute flux calibration

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
  • Recurrence : once at commissioning and then for each LSS observation.
  • Duration : 4 hours

Description

  • Atmospheric calibration to remove telluric atmospheric features from the stellar spectrum and get absolute flux calibration per spectral resolution element.

Prerequisites

  • Authorize SHARK-NIR on the SX side.
  • Atmospheric conditions: AO working conditions.
  • Bad pixel map, Background or Dark, Flat-field, wavelength calibration.

Procedure

  • Observe the spectrum of a featureless (standard) star at a similar airmass to that of the science target.

Templates

Success criteria

  • Better than 10% for absolute flux calibration and average residuals from telluric removal.

Notes

  • Same as activity 7.4 in AD4

LBTO support

  • AO support

Date performed and by whom