Changes between Version 11 and Version 12 of docs/CommissioningPlan/P3.19
- Timestamp:
- 08/24/23 10:51:50 (15 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.19
v11 v12 4 4 - **Status** : Draft 5 5 - **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 6 - **Recurrence** : once at commissioning and then for each LSS observation. 6 - **Recurrence** : once at commissioning and then for each LSS observation. Eventually, only once per night. 7 7 - **Duration** : 2 hours 8 8 9 9 **Description** 10 - Atmospheric calibration to remove telluric atmospheric features from the stellar spectrum. 10 - Atmospheric calibration to remove telluric atmospheric features from the stellar spectrum. If two or more targets are observed during the same night, 11 running the calibration only once is ok if the observations share fairly similar values of airmass and humidity. 11 12 12 13 **Prerequisites**