Changes between Version 2 and Version 3 of docs/CommissioningPlan/P3.17


Ignore:
Timestamp:
02/04/21 22:55:08 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.17

    v2 v3  
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C4)
    5 •       **Recurrence**  :       once every month starting from commissioning and then on                                request for accurate photometry (using CI and DBI).
    6 •       **Duration**            :       1 hour (per configuration, also depends on mag of star)
     4•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
     5•       **Recurrence**  :       once every month starting from commissioning and then on request for accurate photometry (using CI and DBI).
     6•       **Duration**            :       4 hours
    77**Description**
    88•       Throughput calibration to obtain absolute flux calibration of science targets.