Changes between Version 4 and Version 5 of docs/CommissioningPlan/P3.15
- Timestamp:
- 02/04/21 22:53:51 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.15
v4 v5 1 2 == P3.15 Astrometry plate scale and orientation == 1 == P3.15 Astrometry plate scale and orientation == 3 2 • **Phase** : 3 4 3 • **Status** : Draft 5 • **Category** : Nighttime Science Calibration (C5)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 6 5 • **Recurrence** : every night starting from commissioning 7 • **Duration** : 1 hour6 • **Duration** : 2 hours 8 7 **Description** 9 • Determine the astrometry of the science frame. Deduce detector on sky coordinates & plate scale from RA & DEC of aknown multiple stellar systems. This calibration is to be done for a reference setup.8 • Determine the astrometry of the science frame. Deduce detector on sky coordinates & plate scale from RA & DEC of known multiple stellar systems. This calibration is to be done for a reference setup. 10 9 **Prerequisites** 11 10 • Authorize SHARK-NIR on the SX side. … … 13 12 • Bad pixel map, Background or Dark, Flat-field, distortion map 14 13 **Procedure** 15 • Observe multiple system (s)with known characteristics without the coronagraph14 • Observe multiple systems with known characteristics without the coronagraph 16 15 **Success criteria** 17 • Image scale better than 5 mas (goal 0.5 mas) over FoV, image orientation better than 3 arcmin (goal 18 arcsec)16 • Image scale better than 5 mas (goal 0.5 mas) over FoV, image orientation better than 3 arcmins (goal 18 arcsec) 18 17 **Notes** 19 18 • Same as activity 7.1 in AD4