  • docs/CommissioningPlan/P3.14

    v4 v5  
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C4)
     4•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
    55•       **Recurrence**  :       once at commissioning and then on request.
    6 •       **Duration**            :       1 hour
     6•       **Duration**            :       2 hours
    77**Description**
    88•       Acquire a series of sky backgrounds from science images, expected mainly when observing extended objects. A short sky background may also be useful for remaining deviant pixel removal.