Changes between Version 1 and Version 2 of docs/CommissioningPlan/P3.14
- Timestamp:
- 11/04/20 12:14:49 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.14
v1 v2 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : every night starting from commissioning 6 • **Duration** : 30 minutes6 • **Duration** : 0.5 - 1.0 hours 7 7 **Description** 8 • Determine astrometry of science frame. Deduce detector on sky coordinates & plate scale from RA & DEC of a known multiple stellar system. This calibration is to be done for a reference setup.8 • Determine the astrometry of the science frame. Deduce detector on sky coordinates & plate scale from RA & DEC of a known multiple stellar systems. This calibration is to be done for a reference setup. 9 9 **Prerequisites** 10 10 • Authorize SHARK-NIR on the SX side. … … 12 12 • Bad pixel map, Background or Dark, Flat-field, distortion map 13 13 **Procedure** 14 • Observe multiple system(s) with known characteristics without coronagraph14 • Observe multiple system(s) with known characteristics without the coronagraph 15 15 **Success criteria** 16 16 • Image scale better than 5 mas (goal 0.5 mas) over FoV, image orientation better than 3 arcmin (goal 18 arcsec)