Changes between Version 11 and Version 12 of docs/CommissioningPlan/P3.14


Ignore:
Timestamp:
10/12/23 11:30:30 (13 months ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.14

    v11 v12  
    2626**Success criteria**
    2727- Accuracy of 3 mas (goal 1 mas)
     28- A report of the activity performed during daytime tests on 15, 20, and 21 of December 2022 using SHARK-NIR coupled with the M2 adaptive secondary mirror (ASM) of LBT can be found in this ​link
     29- Details of the activity done on-sky and a summary can be found in the minutes of the run.
    2830
    2931**Notes**