    1  == P3.13       Center the slit ==
    2 •       **Phase**               :       3 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C5)
    5 •       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       2 nights
     1 == P3.13       Distortion map ==
     2 
     3- **Phase**             :       3 
     4- **Status**            :       Draft   
     5- **Category**  :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
     6- **Recurrence**        :       once every week starting from commissioning + on request.
     7- **Duration**  :       4 hours
     8
    79**Description**
    8 •       This activity will center the long slit.
     10- Determine distortion map of science frame. Monitor distortion coefficient with time (weekly calibration) and measure the precise distortion of a given observation in any setup, if requested.
     11
    912**Prerequisites**
    10 •       Atmospheric conditions: AO working conditions.
    11 •       Authorize SHARK-NIR on the SX side.
     13- Authorize SHARK-NIR on the SX side.
     14- Atmospheric conditions: AO working conditions.
     15- Bad pixel map, Background or Dark, Flat-field, distortion map
     16
    1217**Procedure**
    13 •       Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit.
    14 * TBD
     18- Observe a dense field (e.g., a globular cluster) with accurate HST astrometry and a guide star bright enough (mag F860W < 11).
     19
     20**Templates**
     21
    1522**Success criteria**
    16 •       xxx
     23- Better than 1 mas over FoV.
     24
    1725**Notes**
     26- Same as activity 9.6 in AD4
    1827
    1928**LBTO support**
    20 •       AO support
    21 **Associated SHARK-NIR personnel**
     29- AO support
    2230
    2331**Date performed and by whom**
    24 
    25 ** Comments**